Water infrastructure

Water Projects

ENEX / ENGINEERING EXPERTISE

Water Supply, Wastewater Treatment and Sewage Disposal Projects

Jordan’s limited water resources have created a need for efficient water networks and the reuse of treated wastewater in agriculture. Since 1979, ENEX Contracting Corporation has worked with water authorities on major water engineering and construction projects across the country.

Our expertise spans the full project lifecycle, from initial studies and design through engineering and construction.

As environmental and social priorities continue to evolve, we place strong emphasis on quality, safety, and environmental protection. Through innovation and engineering expertise, we aim to deliver lasting value for our clients.

ENEX has undertaken water supply and irrigation work across Jordan, including irrigation channels, canals, tunnels, and pressure pipelines. We have also expanded our environmental engineering work to include projects for the collection and treatment of municipal and industrial wastewater.

PROJECT PORTFOLIO

Completed Water Supply Projects

24 projects
Design and construction of Deeban trunk line
Contract No. (47/2016 Special Works) Country: Jordan Employer: Water Authority of Jordan Type and Description: Design and construction of Deeban trunk line. The work involved:
  • Design works
  • Excavation, construction and all concrete works for new pump station
  • Supply and installation of 30 km of I.I.PIPES pipes Dia. 400MM
  • Completion of the irrigation network
  • Supply and installation of SCADA system
Contract Price (JOD): JOD 5,211,343.000 Start date: 9.2016 Finish date: 6.2017
Rehabilitation of Balaama Network in Mafraq Governorate (Stage 2)
Contract No. (II/2014/ 002) Country: Jordan Employer: Water Authority of Jordan Type and Description: Rehabilitation of Balaama Network in Mafraq Governorate (Stage 2). The work involved:
  • Excavation, bedding, pipe laying, pumps, electric panel and two pump stations with 3 pumps
  • (3 x 180 M3/Hour = 540 Cubic Meter/Hour) and Head from 70M to 75M
  • Excavation and construction of a reservoir with 500M3 capacity
  • Embedment, backfilling, pressure test of HDPE pipes and disinfection of pipelines, flushing & bacteriological test of the pipeline & galvanize work
  • Supply and installation of 200km of HDPE pipes Dia. 32mm to 250mm
  • Supply and installation of 18km galvanized pipes
  • Supply and installation of 2km D.I.pipes 200-300mm
Contract Price (JOD): JOD 1,393,966.000 Start date: 8.11.2014 Finish date: 5.10.2015
Ibn Hammad Dam Project
Contract No. (32/2014/SW) Country: Jordan Employer: Water Authority of Jordan Type and Description: Ibn Hammad Dam Project. The work involved: Excavation, drilling, bedding mortar, pipe laying, embedment, backfilling concrete works, and all necessary work for the construction of new Dam Supply and installation of D.I.Pipes and fittings DN 400 – 700 mm Supply and installation of the electro-mechanical works Contract Price (JOD): JOD 24,856,436.000 Start date: 2.2015 Finish date: 2.2017
Rehabilitation of House Connections In Mafraq Governorate
Contract No. (25/2012/SW) Country: Jordan Employer: Water Authority of Jordan Type and Description: Rehabilitation of House Connections In Mafraq Governorate. The work involved:
  • Excavation, bedding, pipe laying, embedment, backfilling, pressure testing of HDPE Pipes and disinfection of pipelines, flushing & bacteriological rest of the pipeline & galvanize work
  • Excavation, construction and all concrete works for reservoir (1000M3)
  • Supply and installation of 82km of HDPE pipes Dia. 63mm,32mm,25mm
  • Supply and installation of 65km Galvanized pipes
Contract Price (JOD): JOD 1,025,993.00 Start date: 22.07.2013 Finish date: 21/7/2014
Construction of water infrastructure of Azraq Refugee Camp, Villages 5 & 6 in Azraq
Contract No. (Villages 5 & 6 Azraq) Country: Jordan Employer: World Vision International Type and Description: Construction of water infrastructure of Azraq Refugee Camp, Villages 5 & 6 in Azraq. The work involved:
  • Supply and installation of polyethylene pipelines (HDPE)
  • 4" (125 mm) diameter, length = 19048m
  • 2" (63 mm) diameter, length = 10500m
  • Water point 39 each, and installation of 4 water stations complete with water tanks with 50m3 in capacity
Contract Price (JOD): JOD 1,497,874.00 Start date: 10.05.2013 Finish date: 10.10.2013
Aqaba Entrance - Wadi El Yutum Interchange Project
Contract No. (181/2001) Country: Jordan Employer: Water Authority of Jordan Type and Description: Aqaba Entrance - Wadi El Yutum Interchange Project. The work involved:
  • Supply and installation of 5.3 km of ductile iron pipeline of DN 600mm
  • Supply and installation of 1.2 km of ductile iron pipeline of DN 300mm
  • Supply all equipment, materials and workmanship for the construction of hydraulic structures, such as concrete chambers, valves, air release valves, wash outs, etc.
Contract Price (JOD): JOD 22,518,674.00 Start date: 15.12.2011 Finish date: 3.6.2013
The Executed Work of King Talal Water Transmission Pipeline Contract (1)
Contract No. (R/1/2009)/C1 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and construct irrigation water transmission line of ductile iron with total length of 19.732km with all necessary fittings and valves from Tal Edhahab weir up to the existing pumping station (PS50) located along King Abdullah Canal in the Jordan Valley. Main pipeline diameters are - 1000mm = 14,570 L.M - 900mm = 5,162 L.M - Connecting the pipeline with existing outlet of Tal Edhahab weir (Source of Water) - Connecting the pipeline with the existing pumping stations (PS55, PS50) located along King Abdullah Canal in the Jordan Valley - Supply and install fiber optic telemetry cables along and in the same trench of the pipeline from Tal Edhahab weir to the existing pumping stations PS55, PS50 - Supply and install fiber optic telemetry cable from Tal Edhahab weir to Dirar bridge along and in the same trench of the pipeline and from Dirar bridge to Dirar Control Center (about 2000m in length) - Construction of cable trench between Dirar Bridge and Dirar Control Center Contract Price (US$): US $16,408,962.00 Start date: 17.03.2009 Finish date: 14.07.2009
The Executed Work of King Talal Water Transmission Pipeline Contract (2)
Contract No. (R/1/2009)/C2 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and construct irrigation water transmission line of ductile iron with total length of 17.060km with all necessary fittings and valves from the existing pumping station (PS50) up to the existing pumping station (PS33) located along King Abdullah Canal in the Jordan Valley. - Main pipeline diameters are: (800mm = 3,756 L.M), (700mm = 9,783 L.M), and (600mm = 3,521 L.M) - Connecting the pipeline with the existing pumping stations (PS46, PS41, PS36, and PS33) and the new pumping station to be constructed near PS41, located along King Abduallah Canal in the Jordan Valley. - Supply and construct all the mechanical works within the sites of all the six existing pumping stations and Tal Edhahab weir. Also supply and install all power and control cables for all the mechanical equipment. - Supply and install fiber optic telemetry cables along and in the same trench of the pipeline and connections for the existing pumping stations (PS50, PS46, PS41, PS36, and PS33) and the new pumping station to be constructed near PS41, located along King Abduallah Canal in the Jordan Valley - Supply and construct (RTU/PS) panels at each site of the existing pumping stations (PS55, PS50, PS46, PS41, PS36, and PS33) in addition to (RTU/T) at Tal Edhahab weir - Supply and construct operator work station (OWS) at Dirar Control Center - Put the SCADA system in full operation between all the pumping stations and Tal Edhahab weir and Dirar Control system Contract Price (US$): US $14,743,525.00 Start date: 17.03.2009 Finish date: 14.07.2009
The Executed Work of the Water Transmission Pipeline Between Wadi Mujib and Kafreen Dam Project
Contract No. (26/2007) Country: Jordan Employer : Water Authority of Jordan Type and Description: - Supply and construct water transmission line of ductile iron with diameter 600mm and with total length of 13.280km with all necessary fittings and valves - Supply and construct water transmission lines that branch out of the main line with the following diameters: -- 600mm = 1,250 L.M -- 450mm = 6,140 L.M - Supply and construct a new pumping station near the Sweimeh pumping station to pump 5 million cubic meters per year - Supply and construct a mixing tank near the entrance of Wadi Hisban with capacity of 2,250 cubic meters Contract Price (US$): US $ 10,320,800.00 Start date: 01.09.2007 Finish date: 30.08.2009
Damia Irrigation Rehabilitation Project
Contract No. (52/2007) Country: Jordan Employer: Water Authority of Jordan Type and Description: - Installation of new conveyors; Ductile Iron pipes (D.I.) with diameters (600, 450, 400, and 300)mm with total length of approximately 15 km. - Pavement of existing dirt road with total length of approximately 4 km. Contract Price (US$): US $2,561,714.00 Start date: 01.09.2007 Finish date: 26.11..2008
Kufranja Effluent Re-Use Project
Tender No. (M/6/2003 El Yutum Wells Pipeline Relocation) Country: Jordan Employer: Water Authority of Jordan Type and Description: - Rehabilitation and extension of domestic water supply system in rural towns. - Providing distribution systems for smaller sewage plant for the re-use of treated wastewater for irrigation. - This contract covers the construction of a total length of pipeline of approximately 7.5km of DN 200 mm D.I. pipes together with the installation of effluent submersible pumps, and construction of new reservoir. Contract Price(US$): US $1,122,554.00 Start date: 15.09.2003 Finish date: 11.06.2004
King Abdullah Canal – Upgrading of Siphons Project
Contract No. 50/2003 Country: Jordan Employer: Water Authority of Jordan Type and Description: The supply and installation of 3.8km of black steel pipelines of diameters ranging from DN 400 mm to 1800. The projects also included the following: - Replacement of 2 existing siphons. - Installation of flume at station 79 and station 226 - Raising of canal lining Contract Price (US$): US $3,182,100.00 Start date: 15.10.2003 Finish date: 08.12.2004
Caradoor Wells Water Supply Project - Supply and Laying of Water Conveyor Line / Aqeb - Halabat
Contract No: 40/ Works / 2000 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 17.5 km of DI main pipelines of diameter DN 600mm. - Supply and installation of 10.2km of DI main pipelines of diameter DN 500 mm - Supply and installation of 2.6km of DI main pipeline of diameter DN 200 mm - Supply, installation and commissioning of 23km of Telemetry Cable - Supply of all equipment, materials and workmanship for the construction of the hydraulic structures such as grit chambers, valves, etc. - Design and construction the right-of-way (26km in length). Contract Price (US$): US $8,596,321.00 Start date: 03.01.2001 Finish date: 09.06.2001
Water Supply Project for Ajloun, Anjara, Ain Janna & Kufranja
Contract No. 1/97 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 76.5 km of primary and secondary pipelines of diameters ranging from DN 100 mm to 200 mm - Replacement of associated house connections in HDPE and galvanized steel pipes as follows: - Supply and installation of 109km of HDPE pipes ranging from 25 mm to 63 mm - Supply and installation 36.5km of galvanized steel pipes - Construction of three water reservoirs (1,000 m³ capacity) Contract Price (US$): US $6,677,533.00 Start date: 01.07.1997 Finish date: 24.11.1999
Tabaqat Fahel (Pella) Water Supply Project
Contract No. 98/95 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 26.2 km of DI main pipelines of diameter DN 600 mm. - Supply and installation of 0.2km of DI secondary pipeline of diameter DN400 mm. - Supply and installation of 5km of black steel pipeline of diameter DN 600 mm. - Supply, installation and operation of five Hydraulic Gates - Construction of new operations room - Supply of all equipment, materials and workmanship for the construction of the Hydraulic Structures such as Collective Reservoir and Grit Chamber - Supply, installation and commissioning 8km of Telemetry Cable Contract Price (US$): US $7,054,248.00 Start date: 25.09.1995 Finish date: 11.06.1997
Water Supply Project for Qa’a Ma’an Tourism and Hotels
Contract No. 182/97 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 27.5 km of black steel pipelines of various diameters ranging from DN 100 mm to 300 mm. - Construction of a water reservoir (2,000 m³ capacity) - Construction of new control rooms - Construction of pressure break tank - Rehabilitation of the existing pumping station, and the installation of new pumps and associated electrical equipment - Supply, installation and commissioning of 4.5km of Telemetry Cable - The installation of tie-in to the existing water wells Contract Price (US$): US $2,472,865.00 Start date: 24.02.1996 Finish date: 17.02.1997
Rehabilitation of the Water System in the Greater Amman Area Racing Club and Al-Nasser
Contract No. 209/92 – C3 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 55 km of DI secondary pipelines of diameters ranging from DN 80 mm to 400 mm - Replacement of associated house connections in HDPE and Galvanized Steel pipes as follows:
  1. Supply and installation of 41.3km of HDPE pipes ranging from 25mm to 63mm
  2. Supply and installation of 33km of Galvanized steel pipes.
Contract Price (US$): US $5,845,717.00 Start date: 02.04.1993 Finish date: 07.09.1995
Azraq Wells Water Supply Project
Contract no. 148/92 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 10 km of black steel primary DN 600mm - Construction of an access road - Supply of all equipment, materials and workmanship for the construction of the Hydraulic Structures such as Grit Chambers, Valves, etc. Contract Price (US$): US $1,619,177.00 Start date: 01.03.1992 Finish date: 08.10.1993
Maghayer El Mhnna - Water Supply Project
Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 8km of black steel primary DN 100mm - Supply of all equipment, materials and workmanship to install all fitting valves, etc. Contract Price (US$): US $225,988.00 Start date: 15.06.1993 Finish date: 01.08.1993
Abour – Eis – Tafila Water Supply Project
Contract No. 21/92 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 10 km of black steel primary and secondary pipelines of various diameters ranging from DN 150 mm to 300 mm - Construction of a water reservoir (550 cubic meters capacity) - Construction of a new pumping station Contract Price (US$): US$ 1,026,733.00 Start date: 15.07.1992 Finish date: 07.06.1993
Murhib Wells Water Supply Project
Contract No. 142/92 Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 23.5km of black steel pipelines of various diameters ranging from DN 100 mm to 300 mm. - Construction of two water reservoirs (1000 cubic meters capacity) - Construction of a new pumping station - Construction of a new chlorination room - Construction of a control room - Design, supply, installation and commissioning of complete cathodic protection systems Contract Price (US$): US $2,681,028.00 Start date: 01.03.1992 Finish date: 01.07.1993
Hallabat Water Supply Project
Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 8km of black steel primary pipelines DN 600mm - Supply of all equipment, materials and workmanship for the construction of the Hydraulic Structures such as Grit Chambers, Valves, etc. Contract Price(US$): US $1,287,186.00 Start date: 15.01.1992 Finish date: 01.06.1993
Walah Water Supply Project
Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of 1000mm and 800mm black steel pipe line, and tie--ins to pumping station. - Supply of all equipment, materials and workmanship to install all fittings, valves, etc. Contract Price (US$): US $322,717.00 Start date: 06.01.1992 Finish date: 02.06.1992
Jerash and North Area of Jordan Water Project
Country: Jordan Employer: Water Authority of Jordan Type and Description: - Supply and installation of water pipeline system for Jerash city and neighboring villages - Supply of all equipment, materials and workmanship to install all fittings, valves, etc. Contract Price (US$): US $961,656.00 Start date: 27.02.1990 Finish date: 20.08.1991
PROJECT PORTFOLIO

Completed Wastewater Treatment and Sewage Disposal Projects

2 projects
Improvement of the Amman Al-Samra Waste Water Project
Ain Ghazal Pretreatment Works Contract No. 180/96 Country: Jordan Employer: Water Authority of Jordan Type and Description: This project involved the design, supply, installation, testing and commissioning of the following:
  • Box Culvert
  • Overflow Inlet and Screening Chamber
  • Grit Chamber
  • Outlet Channel and Flume
  • Screening and Grit removal Building
  • Junction Chamber and Plant Effluent PW
  • Plant Control and Electrical Building
  • All Civil Works
  • Electrical works
  • Mechanical works
Contract Price (US$): US $3,221,598.00 Start date: 20.07.1998 Finish date: 24.09.2000
Mutah University – Turnkey Project
Country: Jordan Employer: Water Authority of Jordan Type and Description: Supply, installation and construction of a complete Wastewater Treatment Plant Contract Price (US$): US $1,542,372.00 Start date: 12.05.1992 Finish date: 13.09.1993